Project

Dalmas

The exploration targets were identified in 2016 through Azimut's predictive mineral potential modeling at the scale of the James Bay region. This property has been part of the Strategic Alliance between Azimut and SOQUEM since 2018. To date, work has been limited to a detailed lake-bottom sediment geochemical survey. This survey identified a 7.5-km by 3-km target with a strong arsenic, bismuth, copper and antimony signature that correlates with a small greenstone belt.

Dalmas

Ownership

SOQUEM 50% - Azimut Exploration 50%

Metals

CSM (Lithium, Gold)

Deposit Type

Volcanogenic Massive Sulphides (VMS) and orogenic gold

Stage

Prospecting

Size

5311.44 ha

Number of Exclusive Exploration Rights

104