Sphinx and SOQUEM cut 4.9% zinc over 2 m including 8.5% zinc over 1 m on the Calumet-Sud project

Sphinx Resources Ltd (“Sphinx” or the “Corporation”) and its partner SOQUEM are pleased to announce the analytical results of three others drill holes, out of a total of 29 holes drilled in January along the 1,500 m long zinciferous zone recognized in the fall of 2018