Project
Dalmas
The exploration targets were identified in 2016 through Azimut's predictive mineral potential modeling at the scale of the James Bay region. This property has been part of the Strategic Alliance between Azimut and SOQUEM since 2018. To date, work has been limited to a detailed lake-bottom sediment geochemical survey. This survey identified a 7.5-km by 3-km target with a strong arsenic, bismuth, copper and antimony signature that correlates with a small greenstone belt.
Participation
SOQUEM 50% - Azimut Exploration 50%
Gérance
SOQUEM 50% - Azimut Exploration 50%
Substances
CSM (Lithium, Gold)
Mineralization type
Volcanogenic Massive Sulphides (VMS) and orogenic gold
Stage
Prospecting
Area
5311.44 ha